top of page
  • White Facebook Icon

Basic Housing Unit Recognition

The Basic Housing Units Ordinance (Cap. 658) is NOW IN EFFECT

We Understand Your Situation

All rented subdivided units MUST meet the "Minimum Standards for Living Environment" and obtain BHU Recognition, or they will be deemed illegal. As "Specified Professionals" (SP) designated by the Ordinance, Kraftwerk's team of Registered Engineers and Architects can help you take immediate action, providing a one-stop solution to handle all statutory requirements and avoid fines or encumbrances on your property.

Minimum Standards of Living Conditions

Minimum Internal Floor Area

  • The minimum internal floor area must be at least 8 m²

  • Internal floor area refers to the area contained within the enclosing walls of a unit, which is measured from the interior face of the external walls or partitions walls, with all partitions and columns within the unit included

Minimum Height

  • Clear headroom must be at least 2.3m from floor to ceiling

  • Clear headroom must be at least 2.0m from the floor to underside of any beam

Fire Safety

  • Same as the existing standards under the Buildings Ordinance (Cap. 123). For example, SDUs should be provided with access to two or more exit staircases (except for single staircase buildings)

  • If the fire-rated door at the original entrances is retained - the clear width of the internal corridor leading to a SDU must not be less than 0.75m; if the fire-rated door is removed or does not have enough fire resisting construction – the clear width of the internal corridor must be not less than 1.05m

  • Each SDU must be equipped with stand-alone fire detectors. Stand-alone fire detectors and fire extinguishers must be installed in the common area (if any) of the residential flat where a SDU is located

Loading

  • Comply with prevailing statutory loading requirements

  • Carry out works in accordance with the simplified requirements of the "Minor Works Control System" by appointing building professionals / prescribed registered contractors to design and supervise the works

Separate Toilet

  • Must be waterproofed toilet and enclosed with partition walls in the SDU for exclusive use by its occupier

  • Waterproofing membrane / material must be applied to the floor and walls of the toilet

Water Supply Point and Sink Outside Toilet

  • A water supply point and a sink must be provided outside the toilet and the area around the water supply point and sink must be waterproofed

Lighting and Ventilation

  • Habitable Area: Must be provided with at least one openable window having at least 0.1 m² superficial area of glass facing the external air, and be fitted with artificial lighting and mechanical means of ventilation capable of supplying fresh air at a rate of at least five air changes per hour

  • Toilet: "Dark toilet" must be fitted with artificial lighting and mechanical means of ventilation capable of supplying fresh air at a rate of at least five air changes per hour

Our Services

NEW01P03260325.jpg

On-Site Inspection &

Professional Advisory

✓ A full list of all non-compliant areas in your unit.
✓ An assessment of missing required installations.
✓ A summary of deficient fire safety standards.

 HK$ 4,500

Recognition Application Service

✓ Submit the BHU Recognition application

✓ Liaising with your contractors to ensure code compliance.

✓ Full document review to prevent delays.

HK$7,500 per BHU

All-Inclusive Recognition & Works Package

✓ Full project supervision by our in-house team.

✓ All design and retrofitting works executed.

✓ Guaranteed BHU Recognition application.

HK$150,000 - $180,000 per BHU

WhatsApp_Image_2025-02-05_at_11_38_32_2_.jpeg

Bespoke Compliance Retrofitting

✓ Full project supervision by our in-house team.

✓ All design and retrofitting works executed.

✓ Guaranteed BHU Recognition application.

Custom On-Site Quotation

Why Choose Kraftwerk?

Team of Registered Engineers & Architects:

Unlike general consultants, our team ensures every solution is fully compliant with the Buildings Ordinance.

One-Stop, Hassle-Free Service:

From paperwork to project completion, we handle everything, saving you invaluable time and effort.

Independent Professional Advice:

We represent your best interests, finding the optimal solution and protecting you from inflated contractor fees.

Contact Us

Address: Unit D8, 11/F, HK Spinners Industrial Building Phase 5, Lai Chi Kok, Kowloon

Email: kraftwerk@muses.com.hk

Tel.: +852 2668-2255 / 9848-7586

© 2026 by KRAFTWERK. All Rights Reserved.

Member of Muses Group

bottom of page